Real Estate Consulting and Violation Removal Services
(888) 338-9606

OP49 Filing for Voiding of Removed Boilers

When a boiler is dismantled or removed from a building an OP-49 application needs to be filed in order to void the boiler on the Dept of Building system. It is important to file this immediately after removing the boiler in order to avoid violations for not filing current inspections of the boiler.

We prepare the necessary forms for the plumber to sign, and handle submission of the paperwork to Dept of Buildings.

Premium Drupal Themes by Adaptivethemes