Parapet Inspection
An inspection of a building’s parapet walls to identify loose masonry, cracks, deterioration, or other unsafe conditions. Certain buildings are required to have parapets inspected periodically under the NYC Building…
An inspection of a building’s parapet walls to identify loose masonry, cracks, deterioration, or other unsafe conditions. Certain buildings are required to have parapets inspected periodically under the NYC Building…
A Partial Stop Work Order is an order issued by the Department of Buildings requiring certain portions of a construction project to cease work while allowing other work to continue.…
A building or space where 75 or more people may gather for purposes such as dining, entertainment, worship, education, or recreation. Many such spaces require a Place of Assembly Certificate…
A series of Department of Buildings forms used to apply for construction work, permits, and related approvals. Depending on the filing type, different PW forms are used throughout the permitting…
A revision submitted to the Department of Buildings after a construction application has been approved to reflect changes in the scope of work, design, or project information. Depending on the…
A DOB filing process that allows a Registered Architect (RA) or Professional Engineer (PE) to certify that a project complies with applicable codes and zoning requirements, enabling DOB to issue…
A professional licensed by New York State to perform engineering services, prepare and certify construction documents, and file applications with the Department of Buildings. Professional Engineers may also serve as…
An FDNY permit required for certain places of public assembly, such as restaurants, theaters, houses of worship, and event spaces, where the occupancy meets or exceeds thresholds established by the…